Model-Free Adaptive Control
                          of Metal Galvanizing Lines 
                        
                          
                            |   | 
                              | 
                           
                          
                            | • Anti-delay
                              and Feedforward
                              MFA effectively handles large or
                              varying delays.  | 
                            • Thickness of precious metal (tin or zinc)
                              is automatically controlled during product changeovers
                              and disturbances. | 
                           
                          
                            | • Prevents over-plating. | 
                            • Tin or zinc consumption is reduced. | 
                           
                          
                            | • Prevents under-plating. | 
                            • Number of defective parts is sharply reduced.
                             | 
                           
                          
                            | • Increases production flexibility. | 
                            • Production throughput is improved. | 
                           
                          
                            | • Improves efficiency & productivity. | 
                            • Full investment is returned in weeks if
                              not sooner. | 
                           
                         
                         
                        
                          
                                                             
                              Speed changes due to product changeovers  
                              cause major quality problems in tin thickness. 
                              On the display at right, two Anti-delay
                              and  
                              Feedforward
                              MFA controllers manipulate the  
                              electrical current (red) quickly to tightly  
                              control the tin thickness (green)  
                              on both top layer and bottom layer.                                | 
                              | 
                           
                         
                        Case History:
                          MFA to control quality variables at Wuhan Iron &
                          Steel Corporation 
                        In a rolling mill, a galvanizing process
                          produces tinned plating. Plating thickness is key to
                          product quality. Plating that is too thick or thin causes
                          an economic loss. 
                           
                          The tinning processing line of Wuhan Iron & Steel
                          (Group) Co. (WISCO) performs large-scale continuous,
                          high-speed tinned plating. Like on most plating lines,
                          thickness could only be controlled manually. Differences
                          in operator skills led inevitably to unstable product
                          quality. 
                           
                          To keep plating continuous, buffers that store strip
                          up to 150 meters long are arranged on both sides of
                          the tank. The outlet buffer stores strip when cutting
                          while the inlet buffer supplies strip when welding.
                          Thickness of the plate is manipulated by the galvanizing
                          current that must be calculated according to the thickness,
                          width and speed of strip, depending on the concentration
                          and temperature of the galvanizing liquid, etc. Behind
                          the outlet buffer, a sensor with a range of 0~15 g/m2
                          measures plating thickness online. 
                           
                          A Modicon PLC is used for logic control and a Windows
                          based PC with SCADA software monitors the system. 
                           
                          Plating thickness could only be controlled in open loop.
                          Large disturbances of strip speed affected thickness
                          even though current was adjusted based on a process
                          model. The buffer between the tank and the sensor creates
                          a large and random time delay that changes from 30 to
                          150 seconds and cannot be predicted. A variation in
                          sizes of products (over 20 types per day) causes frequent
                          changes in process dynamic behavior. On-site disturbances
                          affect product quality and also make automatic control
                          extremely difficult. 
                           
                          An Anti-Delay
                          MFA controller was chosen for closed
                          loop control of plating thickness. A Feedforward
                          controller was used to overcome the speed
                          disturbance. A CyboCon software package was installed
                          in the PC and connected to the Modicon PLC by using
                          CyboLink for Modbus, a serial communication driver. 
                           
                          MFA control succeeded in reaching the objectives defined
                          by WISCO: 
                          • Control of plating thickness to within +/-0.5
                          g/ m2. MFA controllers maintain thickness within +/-0.3
                          g/m2 even if strip speed changes severely. 
                          • Ease of installation and operation. Thirty minutes
                          after connecting to the PLC, MFA controllers for Top-Layer
                          and Bottom-Layer were launched and controlled plating
                          thickness immediately. Commissioning was completed in
                          two days; no maintenance is required. 
                          • Return-on-investment is achieved in a short
                          period of time due to automatic control of the quality
                          variables.  
                        Read